QRE

Rumah> Blog> Power transformers testing and commissioning at the site (instructions and precautions)

Power transformers testing and commissioning at the site (instructions and precautions)

June 04, 2021

Commissioning of Power Transformers

Since I started the commissioning work 30 years back, transformer commissioning consisted of more tests, but nowadays, the number of tests has been reduced due to costs and time-saving. This article will go through complete testing that needs to be done at the site during the commissioning process of the transformer.

Commissioning of Power Transformers

Since I started the commissioning work 30 years back, transformer commissioning consisted of more tests, but nowadays, the number of tests has been reduced due to costs and time-saving. This article will go through complete testing that needs to be done at the site during the commissioning process of the transformer.

Power transformers testing and commissioning at the site (on photo: Transformer dynamic resistance measurements with the Omicron's CPC 100)

Table of contents:

Power transformers testing and commissioning at the site

  1.  Power Transformer Tests

These tests include winding insulation resistance test, winding resistance test, vector group test, tan delta test, no-load test or iron losses, load test or copper losses, temperature rise test, partial discharge test, frequency response analysis test, and transformer oil breakdown test.

These tests are detailed as follows:


1.1 Measurement of Winding Insulation Resistance

The purpose of this test is to determine the insulation resistance of the high-voltage winding to the ground, low-voltage winding to the ground, and the high-voltage winding to the low voltage winding, also to assess the amount of moisture in transformer insulation.


1.2 Winding Resistance Test

The purpose of this test is to measure the D.C. resistance of the transformer windings, this test can be done by a voltmeter and ammeter method. For low reading values, we connect the voltmeter after the ammeter, but for high resistance values, we connect the voltmeter before the ammeter. A sensitive voltmeter and ammeter will be used with a 100 DC Amp


Hubungi kami

Author:

Mr. James

Phone/WhatsApp:

+8613588429173

Produk populer
You may also like
Related Categories

Email ke pemasok ini

Subjek:
Email:
Pesan:

Your message must be betwwen 20-8000 characters

Hubungi kami

Author:

Mr. James

Phone/WhatsApp:

+8613588429173

Produk populer

Mobile Site

Rumah

Product

Phone

Tentang kami

Permintaan

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Kirim